The Loxahatchee Groves Water Control District will begin excavation of the North C Road Canal from Okeechobee Blvd. to North Road on Monday, Nov. 9 to restore the canal to its design cross-section. The excavation should be completed by Dec. 11, but the west side of the canal maintenance berm along North C Road will be closed from Nov. 9 through Feb. 29 to allow for drying of the excavated material, grading and seeding. For more info., call (561) 793-0884.